CALL TO ORDER AND ROLL CALL
INVOCATION
PLEDGE OF ALLEGIANCE
THE COUNCIL MAY GO INTO EXECUTIVE SESSION FOR LEGAL COUNSEL IN ACCORDANCE WITH A.R.S.38-431.03(A) 3 TO DISCUSS ANY AGENDA ITEM. THE FOLLOWING ITEMS MAY BE DISCUSSED, CONSIDERED AND DECISIONS MADE RELATING THERETO:
CALL TO THE PUBLIC - COMMENTS FROM THE PUBLIC
Those wishing to address the Council should fill out request forms in advance. Comments from the Public will be restricted to items not on the agenda with the exception of those on the Consent Agenda. There will be no comments allowed that advertise for a particular person or group. Comments should be limited to no longer than 3 minutes. The Council may not respond to speakers during the call to the public. The Council may direct the City Manager to study the matter or request that the matter be placed on a future agenda.
All matters listed here are considered to be routine by the City Council and will be enacted by one motion. There will be no separate discussion of these items. If discussion is desired, that item will be removed from the CONSENT AGENDA and will be considered separately.
Applicant Thomas Edward King has applied for a Series No. 12 Restaurant Liquor License for a business located at 1921 Club Ave. Staff recommends approval.
In 2021, the Environmental Protection Agency (EPA) released Lead and Copper Rule Revisions (LCRR) which imposed new requirements for public water systems with deadlines for implementation. The City has taken the necessary steps to maintain compliance with these new requirements. This Specialized Services Contract with Hazen and Sawyer continues that effort. This phase will focus on maintaining and improving the service line inventory, supporting customer notification requirements, assisting with field verification activities, and preparing for future regulatory obligations. There is fiscal impact of $295,495 and was approved in the FY27 Budget in the Water Capital Renewal Fund. Staff recommends approval.
This Professional Services Contract is with Sunrise Engineering. The purpose of this project is to evaluate the existing condition and vulnerability of the Downtown Sewer Outfall Line; identify locations where repair, rehabilitation, protection, or replacement improvements may be warranted; list and prioritize the recommended improvements; and develop planning-level opinions of probable construction cost. There will be a fiscal impact of $61,100.00 to be paid from the Wastewater Capital Renewal Fund. Staff recommends approval.
Roger Sayles (Requestor) owns property located north and east of the subject city owned property (APN: 330-31-001). Due to topographical constraints and based on historic use the only viable access is a circuitous route that currently bisects the city owned 635 acre parcel from east to west before turning northward towards Mr. Sayles property. The easement as shown is approximately 1,469 feet in length and represents approximately 1.349 acres of the 635 acre parcel. There are currently no development plans or other identified use of the 635 acre parcel, and the proposed easement would not unjustly encumber the city owned land. A fair market appraisal was performed to assess the value of the land for the purposes of ingress and egress and has established a value of $352.57. Staff recommends approval.
Consideration and possible approval of a cooperative agreement with Infosend, Inc. for utility bill printing and mailing services upon expiration of the City's current agreement in November 2026. The proposed agreement provides for an initial three-year term, with two optional one-year renewals, and utilizes a competitively procured contract awarded by the City of Compton, providing favorable pricing, terms, and conditions while maintaining continuity of essential printing and mailing services. There will be an estimated fiscal impact of $24,315 for bill print services and $109,765 for postage costs in FY27 (partial year cost with services starting in November), and $173,229 for bill print services and $782,017 for postage costs in FY28-FY32 to the Water Operating Fund. Staff recommends approval.
CSE, LLC, also known as Big Red Construction, completed street improvements and utility extensions on Apache Street between Airfield Avenue and Pacific Avenue. Total cost of the utility extensions is $89,138.35 across 1,112.5 LF of frontage, equal to $80.12 per LF of frontage. Staff recommends approval.
On November 24, 2025, the City Council authorized staff to enter into a contract with Sunrise Engineering, LLC to complete the Taylor & Commercial Street Sewer Project. This project involves abandoning the aging and failing asbestos cement pipe within the project area and designing new sewer infrastructure to serve existing and future residents. The original contract amount for these services was $23,500 and included the Design Concept Report only. On September 1, 2026, the City Council approved Amendment No. 1 in the amount of $81,200 to prepare construction drawings. This proposed Amendment includes additional survey and design services for additional sewer improvements along West Park Street and South 2nd Street, as well as geotechnical services. Approval of Amendment No. 2 will increase the total professional services agreement by $17,474 bringing the total contract award to $122,174. This project is funded out of the Wastewater Capital Renewal Fund. Staff recommends approval.
It is being requested that the November 3, 2026 regularly scheduled City Council meeting be canceled due to it being General Election Day. Staff recommends approval.
ACTION ITEMS
The Main Tanks Transmission Main Phase 2B project is the second phase of completing a transmission main that runs from the Castlerock Booster Station to the Main Tanks site. The project was awarded to Freiday Construction, Inc. on June 16, 2026 in the amount of $2,013,570. On August 4, 2026 Council approved Change Order No. 1 in the amount of $9,000 to include Survey and Staking. This proposed change order increases the hard dig allowance from 500 CY to a total of 2,500 CY which is expected to accommodate anticipated hard dig conditions during the remainder of the project. The change order also increases the asphalt pavement replacement quantity from 1,147 SY to 1,500 SY. Change Order No. 2 increases the contract amount by $606,455 for a total contract amount of $2,629,025 and will be funded through the Water Expansion Fund. Staff recommends approval.
The City has received the 95% design plans for the third phase of Flying Fortress Parkway. Stormwater detention or retention is required to maintain pre-existing downstream flow conditions. Engineering has developed three options to address the stormwater conditions. Staff is seeking Council direction.
ANNOUNCEMENTS BY MAYOR, COUNCIL MEMBERS, CITY MANAGER
Limited to announcements, board and commission liaison reports, availability/attendance at conferences and seminars.
COUNCIL REQUESTS FOR FUTURE REPORTS AND UPDATES
ADJOURNMENT
ALL PERSONS ATTENDING THE COUNCIL MEETING, WHETHER SPEAKING TO THE COUNCIL OR NOT, ARE EXPECTED TO OBSERVE THE COUNCIL RULES, AS WELL AS THE RULES OF POLITENESS, PROPRIETY, DECORUM, AND GOOD CONDUCT. ANY PERSON INTERFERING WITH THE MEETING IN ANY WAY, OR ACTING RUDELY OR LOUDLY WILL BE REMOVED FROM THE MEETING AND WILL NOT BE ALLOWED TO RETURN.